try the craigslist app » Android iOS
favorite
favorite
hide
unhide
flag

Posted

print

DECONSTRUCTION OF FRAMED STRUCTURE (Annandale)

1234

compensation: Best proposal

This structure needs to be taken down. The nails need to be cut off and materials stacked at curb because they will be donated to charity. Sheathing smaller than 1/2 sheet needs to be put in dumpster. Footings and block need to be removed and put in dumpster. It's a pretty good job for a crew with a mini-excavator. It was framed in three days so should not take a long time to be taken down. Nothing but sheathing and 2x's.

See photos provided.
  • do NOT contact me with unsolicited services or offers

post id: 7098434650

posted:

updated:

best of [?]